Bull Hedging
  • Politics
  • Stocks
  • Business
  • Investing
  • Politics
  • Stocks
  • Business
  • Investing

Bull Hedging

Investing

Refurbishment of Toll Milling Plant on Track

by admin April 30, 2025
April 30, 2025
Refurbishment of Toll Milling Plant on Track

Challenger Gold Limited (ASX: CEL) (“CEL” the “Company”) notes the ASX Release by Austral Gold Limited titled ‘Austral Gold Provides Update on Casposo Plant Refurbishment’ today. The release provides an update on the refurbishment of the Casposo Processing Plant and reports that the refurbishment is on track for the start up of commercial operations in the second half of 2025.

HIGHLIGHTS

  • Austral Gold announced that Casposo Plant refurbishment is advancing safely and efficiently across all core workstreams.
  • Austral update aligns with second independent plant inspection commissioned by CEL.
  • CEL’s inspection was undertaken by the same process engineers that completed the Audit of the Casposo Plant and Restart Plan in December 2024.
  • Key takeaways from the second inspection report commissioned by CEL are:
    • Robust advancement across all key processing areas
    • Progress in line with existing refurbishment schedule
    • Solid-liquid separation capacity (previously identified as a key risk) appears adequate for the required 1000 TPD capacity
    • Sufficient time remaining to complete all maintenance work to meet the commissioning target in Toll Milling Agreement during the second half of 2025.

The Austral update aligns with a second independent plant independent inspection report received by the Company during April 2025. This report was prepared by the leading process group that completed the independent Audit of the Casposo Plant in December 2024 (ASX Release dated 13 December 2024).

Background to Toll Milling

The Company has executed a binding Agreement with Casposo Argentina Mining Limited, the operator of the Casposo Plant located in San Juan Argentina. This Toll Milling Agreement secures processing of a minimum of 450,000t of near surface Hualilan mineralised material over 3 years (ASX Release dated 30 December 2024).

The Casposo Plant, located 170km from Hualilan via established roads, has historically produced over 323,000 ounces of gold and 13.2 million ounces of silver. During operations, the plant achieved average annual production of 40,000 ounces of gold and 1.6 million ounces of silver at recoveries of 90% for gold and 79% for silver. The plant has been on care and maintenance.

The primary objective of this Toll Milling strategy is to capitalise on the current high gold price (above US$3,300/oz) to generate early cash flow. This cashflow will be allocated towards the construction of the standalone Hualilan Gold project including a Flotation with Tails Leach (“FTL”) circuit, a potential Heap Leach (“HL”) pad at Hualilan, and open pit mining fleet.

Click here for the full ASX Release

This post appeared first on investingnews.com

previous post
INSG: Global Nickel Surplus to Hit 198,000 MT in 2025
next post
First Assay Results from Rae Copper Project Returns High Grade Copper

Related Posts

Blue Sky Uranium Acquires Key Subsurface Data for...

July 3, 2025

Gold, Silver and Bitcoin Prices Fall as Fed...

December 20, 2024

Top 5 Most-popular Gold News Stories of 2024

December 31, 2024

Options Prospectus

October 20, 2025

Becancour Lithium Refinery Definitive Feasibility Study

February 17, 2025

4 Platinum Uses for Investors to Know

January 29, 2026

Brunswick Exploration

June 19, 2025

SAGA Metals Begins Mobilization Efforts for Maiden Drill...

January 7, 2025

Guide to Uranium Mining in Canada

August 21, 2025

NevGold Releases Some of the Highest Grade Oxide...

June 26, 2025

Recent Posts

  • The Real Drivers of This Market: AI, Semis & Robotics
  • S&P 500 Breaking Out Again: What This Means for Your Portfolio
  • Capitol police arrest Rubio hearing disruptor, as Republican senator says ‘off to jail’
  • Trump calls on employers nationwide to match contributions into workers’ kids’ Trump Accounts
  • Rubio warns NATO allies US is ‘not simply focused on Europe,’ doesn’t have unlimited resources

Recent Comments

No comments to show.

About Us

About Us

Design Magazine

Welcome to Design Magazine. Follow us for daily & updated design tips, guide and knowledge.

Stay Connect

Facebook Twitter Instagram Pinterest Youtube Email

Recent Posts

  • The Real Drivers of This Market: AI, Semis & Robotics

    January 29, 2026
  • S&P 500 Breaking Out Again: What This Means for Your Portfolio

    January 29, 2026
  • Capitol police arrest Rubio hearing disruptor, as Republican senator says ‘off to jail’

    January 29, 2026
  • Trump calls on employers nationwide to match contributions into workers’ kids’ Trump Accounts

    January 29, 2026
  • Rubio warns NATO allies US is ‘not simply focused on Europe,’ doesn’t have unlimited resources

    January 29, 2026
  • Gulf shipping operations grind to halt near Iran, US quietly prepares for possible strike: ‘Heightened risk’

    January 29, 2026

Editors’ Picks

  • 1

    Environmental Approval for Boland Infield Studies & Update on Scaled Column ISR Test

    September 19, 2025
  • 2

    Small Caps are Set to Skyrocket in 2025—Here’s What You Need to Know

    December 12, 2024
  • 3

    Trump leaves China guessing what his next move is with unusual inauguration invitation

    December 15, 2024
  • 4

    Ad revenue should stabilize for media companies in 2025 — if they have sports

    December 31, 2024
  • 5

    Zinc Stocks: 4 Biggest Canadian Companies in 2025

    January 15, 2025
  • 6

    Uranium Price Forecast: Top Trends That Will Affect Uranium in 2025

    December 19, 2024
  • 7

    Lead Price Forecast: Top Trends for Lead in 2025

    January 11, 2025
Promotion Image

banner

Categories

  • Business (607)
  • Investing (2,913)
  • Politics (3,568)
  • Stocks (1,054)
  • About us
  • Contacts
  • Privacy Policy
  • Terms and Conditions
  • Email Whitelisting

Copyright © 2026 bullhedging.com | All Rights Reserved