Bull Hedging
  • Politics
  • Stocks
  • Business
  • Investing
  • Politics
  • Stocks
  • Business
  • Investing

Bull Hedging

Investing

Initial Drill Results at Orom-Cross Highlight High Grade Shallow Zones

by admin September 26, 2025
September 26, 2025
Initial Drill Results at Orom-Cross Highlight High Grade Shallow Zones

Blencowe Resources Plc (LSE: BRES) is pleased to announce the first batch of assay results from its Stage 7 drilling programme at its Orom-Cross graphite project in Northern Uganda. This campaign, the largest in the Company’s history, included geotechnical holes, infill drilling and exploration drilling across both the Camp Lode and Northern Syncline deposits, as well step-out and deep drilling at the newly identified Beehive deposit.

Assays are being processed in batches for each component of the programme and will be reported regularly as results are returned. The first results, from the eight geotechnical holes drilled primarily to support pit design, have returned strong graphite grades.

These results confirm extensions to mineralisation and highlight high-grade zones within the existing deposits, further underscoring Orom-Cross’s unique combination of high grade, shallow ore and large-scale potential.

Highlights:

Camp Lode

  • Hole CLGT03: 27.54m @ 8.68% TGC, including 1.3m @ 18.98% TGC and 1.3m @ 13.46%TGC
  • → Confirms high-grade extensions to the orebody to the south-east.
  • Hole CLGT02: 3.96m @ 9.08% TGC at depth.
  • Shallow intersections in CLGT01 and CLGT04 confirm near-surface mineralisation and potential to extend the pit to the north.

Significance: Adds higher-grade tonnes to the Camp Lode resource and optimises mine scheduling for early production phases.

Northern Syncline

  • Hole NSGT02: 27.98m @ 4.61% TGC, including 5.57m @ 8.10% TGC (majority <30m depth).
  • Hole NSGT04: 12.37m @ 6.09% TGC.

Significance: Confirms shallow, high-grade mineralisation continuity in infill zones which are critical for low-cost, open-pitable production.

Drilling Programme Integration

  • All results will be incorporated into the JORC Resource upgrade, which is expected to deliver a material increase in Reserves to support large-scale mining over life of mine.
  • Additional assays from infill, step-out and deep drilling (Beehive deposit) programmes are expected shortly.

Construction of a Permanent Camp

Work is now underway on building a permanent camp at Orom-Cross which is expected to support further exploration in 2026 and provide facilities for contractors during the construction of the mine. This permanent camp represents the first tangible permanent structures on site which underlines the progress being made. With the DFS expected to be completed in Q4 2025 the next steps thereafter will be project funding and then construction of the mine.

Executive Chairman Cameron Pearce commented:

‘The results confirm high-grade extensions to both Camp Lode and Northern Syncline, while reinforcing the advantage of shallow, easily mined ore that underpins our low-cost production profile.

All this data will be fed directly into both our JORC Resource upgrade and the Definitive Feasibility Study, which is due for completion in Q4 2025. Increasing ore reserves at higher grades is a critical step and we expect this to not only enhance the mine plan but also translate into a considerable uplift to project economics and NPV.

Orom-Cross already benefits from a unique combination of attributes, including abundant low cost national-grid hydropower, established roads and infrastructure, and independent test work from both Wuhan University and American Energy Technologies confirming some of the highest SPG purities recorded (up to 99.99% GC). This underscores the exceptional quality of Orom-Cross graphite and its suitability for premium battery-grade markets. Together, these factors give Orom-Cross a rare blend of scale, quality and deliverability that make it a truly bankable graphite opportunity.

With assays now beginning to come through and more results to follow we look forward to a steady flow of updates, including the JORC upgrade and the DFS. These milestones will showcase Orom-Cross as a standout global graphite project, provide the platform to move directly into financing discussions, and ultimately set the stage for a major value re-rating as we continue to de-risk.’

Preliminary drill results Camp Lode

Preliminary drill results Northern Syncline

Further Drilling Detail

The Company drilled four geotechnical holes in each of the Northern Syncline and Camp Lode deposits. While primarily designed for geotechnical assessment to inform pit wall design, all holes were sampled for assays and incorporated into resource database.

At Camp Lode, these holes have indicated a possible extension to the orebody in the south-east, with hole CLGT03 intersecting 27.54m @ 8.68%GC including 2 separate intersections of 1.3M with grades of 18.98%GC and 13.46%GC respectively. These represent very high grades of graphite in comparison to the overall Orom-Cross resource. An additional intersection from hole CLGT02 of 3.96m @ 9.08%GC at depth and intersections near surface in holes CLGT01 and CLGT04 indicate potential to extend the pit to the north.

Similarly, at Northern Syncline hole NSGT02 intersected 27.98m @ 4.61%GC (including 5.57m @ 8.10%GC) and NSGT04 with 12.37m @ 6.09%GC. The intersection from NSGT02 occurs within the area of the completed infill drilling with the majority of the intersection occurring within 30 meters of the surface. The ability to mine substantial volume of graphite from shallow depths contributes to Orom-Cross having operating costs sitting within the lowest percentile of graphite projects worldwide, and this is considered a major advantage as Blencowe drives towards first production.

The results from all eight holes will be included within the resource model updates. The assay labs are continuing to prioritise the Orom-Cross samples and the Company expects further results of the infill program shortly.

For further information please contact:

Blencowe Resources Plc

Sam Quinn

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

Tavira Financial

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is finalising the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

Source

This post appeared first on investingnews.com

previous post
Zijin Mining Surges Past US$100 Billion Valuation Despite IPO Delay
next post
Harris literally threw ‘JOE BIDEN WON’ talking points on table after disastrous debate: ‘Are you kidding me?’

Related Posts

Edjudina Gold Project, WA – Permitting Application to...

March 26, 2025

Silver Crown Royalties Executes Definitive Agreement to Acquire...

December 16, 2024

Jp Cortez: Is America’s Gold Really There? US...

June 17, 2025

Harvest Gold: Advancing the Large-scale Mousseau Gold Project...

June 20, 2025

Empire Metals Limited Announces Warrant Exercise

June 13, 2025

Purepoint Announces Amendment of Omnibus Equity Incentive Compensation...

May 29, 2025

Rio Tinto, Eurodia Team Up for Argentina Lithium...

February 8, 2025

Types of Iron Ore: Hematite vs. Magnetite

February 5, 2025

Halleck Creek Resource Expands to 2.63 Billion Tonnes...

January 29, 2025

Lode Gold Closes Financing – $790,186 to Advance...

April 16, 2025

Recent Posts

  • The Real Drivers of This Market: AI, Semis & Robotics
  • S&P 500 Breaking Out Again: What This Means for Your Portfolio
  • Israel identifies remains of 10th deceased hostage handed over by Hamas
  • REBECCA GRANT: How Tomahawks work and how they could change everything for Ukraine
  • Tesla’s self-driving cars under fire again

Recent Comments

No comments to show.

About Us

About Us

Design Magazine

Welcome to Design Magazine. Follow us for daily & updated design tips, guide and knowledge.

Stay Connect

Facebook Twitter Instagram Pinterest Youtube Email

Recent Posts

  • The Real Drivers of This Market: AI, Semis & Robotics

    October 19, 2025
  • S&P 500 Breaking Out Again: What This Means for Your Portfolio

    October 19, 2025
  • Israel identifies remains of 10th deceased hostage handed over by Hamas

    October 19, 2025
  • REBECCA GRANT: How Tomahawks work and how they could change everything for Ukraine

    October 19, 2025
  • Tesla’s self-driving cars under fire again

    October 19, 2025
  • From Israel to Ukraine, Trump spends week focused on navigating global conflicts

    October 19, 2025

Editors’ Picks

  • 1

    Small Caps are Set to Skyrocket in 2025—Here’s What You Need to Know

    December 12, 2024
  • 2

    Ad revenue should stabilize for media companies in 2025 — if they have sports

    December 31, 2024
  • 3

    Trump leaves China guessing what his next move is with unusual inauguration invitation

    December 15, 2024
  • 4

    Lead Price Forecast: Top Trends for Lead in 2025

    January 11, 2025
  • 5

    Uranium Price Forecast: Top Trends That Will Affect Uranium in 2025

    December 19, 2024
  • 6

    Zinc Stocks: 4 Biggest Canadian Companies in 2025

    January 15, 2025
  • 7

    Trudeau declares himself ‘proud feminist’ after lamenting Harris loss to Trump as setback for women

    December 13, 2024
Promotion Image

banner

Categories

  • Business (579)
  • Investing (2,215)
  • Politics (2,711)
  • Stocks (850)
  • About us
  • Contacts
  • Privacy Policy
  • Terms and Conditions
  • Email Whitelisting

Disclaimer: bullhedging.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.


Copyright © 2025 bullhedging.com | All Rights Reserved